Before installation:
> Clean and deburr the pipes (remove all residual materials like rust or paint, for example)
> Damage to the ends of the pipe absolutely must be eliminated
> For locked couplings, is the optimal distance between the ends of the pipes is 3-8 mm.
> For unlocked couplings, the distance depends on the width of the coupling
> as well as on use of a vacuum ring
Mark
Measure a distance equal to half of the pipe coupling and subtract 2.5 mm.
Mark the ends of the pipe at the distance calculated. This ensures that the ends of the pipe
do not come into contact with each other and that the coupling is centered over the ends of the pipe
after installation.
Align
Push on the pipe coupling and align it on the markings.
Stainless steel TEEKAY installation installation guide installation
Before installation:
> Clean and deburr the pipes (remove all residual materials like rust or paint, for example)
> Damage to the ends of the pipe absolutely must be eliminated
> For locked couplings, is the optimal distance between the ends of the pipes is 3-8 mm.
> For unlocked couplings, the distance depends on the width of the coupling
> as well as on use of a vacuum ring
Mark
Measure a distance equal to half of the pipe coupling and subtract 2.5 mm.
Mark the ends of the pipe at the distance calculated. This ensures that the ends of the pipe
do not come into contact with each other and that the coupling is centered over the ends of the pipe
after installation.
Align
Push on the pipe coupling and align it on the markings.