
Please note: heco gmbh will discontinue support for Internet Explorer in early 2021.
We recommend Microsoft Edge , which is already installed on Windows 10, also Google Chrome or Mozilla Firefox.

measures and values
development of stocks
request list
associated articles
current selection
installation examples
StrengThin™ System 100
ST100 in practice |
---|
• groove time: 2 minutes for DN 300 |
• installation time: coupling, installation-ready up to DN 300 - 3 minutes |
• full installation time in practice: 12 minutes per connection |
Abb. 2
process water - use with thermoplastic coated coupling
Abb. 3
refrigeration system - use with butterfly valve
Abb. 4
refrigeration system - use with cap with valve connection
Abb. 5
well water system - use with flange adapter
Abb. 6
potable water pump station
Ask our experts
Stainless steel Victaulic StrengThin™ 100 handling installation examples
installation examples
StrengThin™ System 100
ST100 in practice |
---|
• groove time: 2 minutes for DN 300 |
• installation time: coupling, installation-ready up to DN 300 - 3 minutes |
• full installation time in practice: 12 minutes per connection |
Abb. 2
process water - use with thermoplastic coated coupling
Abb. 3
refrigeration system - use with butterfly valve
Abb. 4
refrigeration system - use with cap with valve connection
Abb. 5
well water system - use with flange adapter
Abb. 6
potable water pump station
Ask our experts